Case Study: ETAP – ATLL

Property: DRINKING WATER TREATMENT STATIONS – ETAP AIGüES TER LLOBREGAT, S.A. (ATLL) Contractor: ACCIONA INFRAESTRUCTURAS, S.A. Project Management: INYPSA Informes y Proyectos S.A. Specialist Applicant: GRUPO IRACO Advanced Coating Systems Measurement: 36.307 sq. m. Systems: AQUAPRO ® PY 3250 CASE STUDY… [+]

WATERPROOF MAGAZINE HOTELS

GRUPO IRACO, Advanced Coating Systems; has been in charge of the waterproofing of multiple hotels, with the AQUAPRO® waterproofing systems. Those projects have involved different areas of buildings: foundations, ducts, structures with landscaped floors, swimming pools, terraces, etc. In the… [+]

CASE STUDY: ST. ANTONI MARKET

Property:  INSTITUT MUNICIPAL DE MERCATS DE BARCELONA Contractor:  UTE ARQUITECTURA NOU MERCAT DE SANT ANTONI / SACIR – COPCISA UTE URBANIZACIÓN MERCAT DE SANT ANTONI / ELECNOR – ALAINSA Project Management: ACTIO PROJECT Management Engineering Prescriber / Specialist Applicant: GRUPO IRACO Advanced Coating Systems Measurement:… [+]

CASE STUDY: PARKING

Property: HOMEOWNERS’ ASSOCIATION Project Management: CAPILLA MONACO ARQUITECTOS Contractor: GRUPO IRACO, ADVANCED COATING SYSTEMS Specialist Applicant: GRUPO IRACO, ADVANCED COATING SYSTEMS Measurement: 2.000 sq.m Systems: AQUAPRO PY 3250 CASE STUDY PDFSee PDF with project details Open PDF